Vietnam MIC certification

Certification Introduction

Vietnam's MIC department issued an announcement in early 2016 that from October 1 this year, all lithium batteries, including those sold independently and used in terminal products (notebooks, tablets, mobile phones, etc.), will require DOC certificates (standard number: QCVN 101:2006/BTTTT). The above products will also be required to provide the DoC of the battery when doing the Vietnam MIC certification.

On July 4, 2016, the MIC department considered that the cycle of product testing and certification was too long, and battery manufacturers did not have enough time to meet the certification requirements, and issued a notice again: postpone the implementation of the mandatory certification date of battery products to April 1, 2017 .

The following is the notice that Vietnam MIC postponed the implementation of the compulsory certification of battery products:
the Ministry of Information and Communications of the Socialist Republic of Vietnam (MIC), for the electromagnetic interference and communication products of information products, the implementation of mandatory related TCVN/TCN standard specification. The electromagnetic interference part can be applied by local suppliers in the form of self-declaration, and finally approved by the Ministry of Information, the products can be sold in the Vietnamese market.
The IEC testing standards corresponding to Vietnam’s regulations on battery certification, QCVN 101: 2016/BTTTT, are IEC61960 (2011)  and IEC62133 (2012). [Note: These two standards must be met to meet the QCVN standards.

Documents to be submitted for certification application

(1) Technical model specification table
(2) Quality declaration management system
(3) Control approval method of quality certificate or ISO9001 certificate
(4) Structural protection approval certificate
(5) Claimed rated power
(6) Antenna report
(7) Test report
(8) (Block Diagram, Schematic Diagram, Bill of Material, Parts Placement, IC Data Sheets, Internal and External Photos, Product Deion, User manual, Operational/Technical Deion, Deion of Pheripherals/Accessories)
(9) Label Information
(10 ) ) Power of Attorney / Power of Attorney

Certification process

1) The manufacturer provides the product manual, the laboratory confirms the quotation, and the two parties sign a cooperation contract.
2) Materials to be submitted for application: samples, product manuals, circuit diagrams, block diagrams, operation descriptions, BOM, key component certificates, application forms and other materials.
3) After collecting all the materials, the laboratory will officially start the certification project and arrange the test.
4) After the test is completed, a test report and certificate will be issued.
5) Normal test cycle: 2-3 weeks.